During the 12th Five-Year Plan period & rdquo;, Northern Heavy Industry Group will build the 1 energ
Quench Tank Energy Management Information Management
During the 12th Five-Year Plan period & rdquo;, Heavy Industry Group will build the 1 energy management information dispatching center. At that time, the platform can realize real-time monitoring, control and analysis of energy operation status, and achieve the effect of automatic control, unattended and information management of power supply.
The circulating water pump room in the 103 workshop of the Special Steel Branch of Heavy Industry Group is the first pump room of the company to adopt unattended operation mode. Quenching tank After the tank is stopped, the automatic monitoring system composed of Siemens configuration software will reduce the water temperature to 30 ℃ within 1.5 hours. The control system can quickly switch between automatic and manual modes to ensure the safety of the system operation.
At present, Heavy Industry Group is laying optical cables in 66 power operation stations, including heat exchange station rooms, water supply pump rooms and steam boiler rooms, and is equipped with optical fiber transceivers at each station. In order to realize the fine management of power energy, the power energy branch has set up an automatic control group composed of 6 technicians. This year, the Heavy Industry Group will also improve the automation and informatization of the two furnaces of the Special Steel Branch.
More Quenching tank energy management information management: www.quenchtank.com/view-171.html